The project is a contract aimed at maintaining asset integrity through oil
flushing and chemical cleaning activities at various brownfield sites.
The scope of the project includes the following:
Pre-engineering activities to prepare procedures and work packs:
Before the oil flushing and chemical cleaning activities commence,
there will be pre-engineering activities to prepare the necessary
procedures and work packs.
Site survey: Site surveys will be carried out to assess the condition
of the equipment and determine the most effective oil flushing and
chemical cleaning processes to be used.
System preparation: The systems will be prepared for the oil flushing
and chemical cleaning activities, which will involve the isolation and
draining of the equipment.
Online flushing for Lube oil and seal oil tanks to required NAS
specifications: The project will involve the online flushing of Lube
oil and seal oil tanks to the required NAS specifications, which is
aimed at removing contaminants and debris from the equipment.
Chemical cleaning of coolers and associated pipe network: The chemical
cleaning of coolers and associated pipe networks will be carried out
to remove accumulated deposits and contaminants that could reduce the
efficiency and lifespan of the equipment.
Verification of work through oil sampling test, borescope inspections:
The verification of the work done will be carried out through oil
sampling tests and borescope inspections to ensure that the oil
flushing and chemical cleaning activities have been carried out
effectively and meet the required standards.